This project showcases the very best in materials and craftsmanship. The fit-out included Corian and Cedar reception counters, Cedar veneer and gloss white office fittings, and Cedar tongue-and-groove wall cladding. With such premium materials, achieving a flawless finish was essential.
Our accredited Corian fabricators produced the reception counters in-house before carefully disassembling them for delivery. On site, each section was seamlessly joined and polished to perfection. At seven and four metres long, the cantilevered counters make a bold statement, enhanced further with a back-lit logo that takes pride of place in the reception area.
To complement the counters, faceted feature wall tiles were used to create an incredible visual effect. Each 400 × 400mm tile was precision-machined on the Homag BAZ CNC (Flex 5 head), then individually assembled and polished to ensure a striking result.
Development management
Detailed drawings for manufacture
Production and fabrication
Construction and installation